In practice, the control charts for monitoring of process mean are based on the normality assumption. But the performance of the control charts is seriously affected if the process of quality characteristics departs from normality. For such situations, we have modified the already existing control charts such as Shewhart control chart, exponentially weighted moving average (EWMA) control chart and hybrid exponentially weighted moving average (HEWMA) control chart by assuming that the distribution of underlying process follows Power function distribution (PFD). By considering the situation that the parameters of PFD are unknown, we estimate them by using three classical estimation methods, i.e., percentile estimator (P.E), maximum likelihood estimator (MLE) and modified maximum likelihood estimator (MMLE). We construct Shewhart, EWMA and HEWMA control charts based on P.E, MLE and MMLE. We have compared all these control charts using Monte Carlo simulation studies and concluded that HEWMA control chart under MLE is more sensitive to detect an early shift in the shape parameter when the distribution of the underlying process follows power function distribution.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.