During 2008-2009, Saudi Aramco recorded two major nonassociated gas field discoveries in the Arabian Gulf. The initial plan was to develop both fields with deviated extended reach 7" completion wells, which will be drilled from multi-well platforms. Based on the challenging subsurface conditions of the problematic highly fractured shallow horizons, in addition to the thick, highly fractured, and excellent carbonate Khuff reservoir quality, the decision was carefully made to develop both fields with vertical large bore wells completed as monobore with 9⅝" pre-perforated uncemented liner across the pay zone and 9⅝" production tubing to the surface. The large bore wells are planned to be drilled from single-well platforms that can be strategically located around the two fields to allow efficient spacing and depletion to produce initial gas rates up to 300 MMscfd per well.The large bore well design has a potential for maximizing the gas production from each well and reducing the overall field development costs down by 45% by minimizing the number of wells and facilities required without jeopardizing the production, safety or integrity of the development projects.The shallow horizons in the newly discovered fields, along with the targeted Khuff reservoir, are considered to be highly faulted structures with many associated fractures that can continuously cause drilling problems with lost circulation and differential sticking. The newly planned vertical large bore wells tend to reduce drilling problems. Nevertheless, those planned vertical large bore wells are still capable of producing the required high gas rates.The intent of this paper is to highlight the multiple challenges faced during the early exploration and delineation phase of the fields and to share the experience of planning new offshore field development strategies for large bore wells with high reservoir temperature and pressure (T&P). Transforming from the original development plan to the optimized large wellbore completion plan, takes advantage of the excellent reservoir quality and high flow capacity, allowed for many optimization efforts. Such optimizations have changed the entire project strategy to accelerate the official onstream startup date without any compromises.
Well placement and trajectory planning is a critical and challenging task in any Oil & gas field development plan. This has always been a task that requires a strong team effort to ensure the best predictions and estimations are performed to penetrate the desired reservoir development zones and achieve the expected production rates. Numerous iterations with a high level of interaction between Reservoir Management, Reservoir Simulation, Reservoir characterization, Geology and Geophysics are expected when planning a new well or a difficult sidetrack. Each member of the well planning team has his/her own environment along with dedicated standalone software tools. Today, with the introduction of the Intelligent Field center to provide the collaboration environment for the involved expertise along with the proper tool to offer a strong integration of different data sources in a single software environment that allows a team of field geologist, geophysicist, reservoir and simulation engineers to evaluate the best prospects available in planning any new drilling opportunity, furthermore the team is able to choose the best well azimuth and inclination based on reservoir properties and performance. This paper discusses a newly integrated well planning process utilizing a collaboration environment to review seismic, well log cross sections, historical production and simulation predictions enabling the well planning team to place their gas wells using a reservoir 3D viewer, incorporating the reservoir simulation model, and run various cases and sensitivities. In This paper, full examples illustrate how effective software integration can optimize the time required to plan a new well without overlooking any important aspect. In addition, the paper discusses the lessons learned from this experience and how this approach changes the mechanism of an integrated well planning team working together.
Well placement and trajectory planning is a critical and challenging task in any Oil & gas field development plan. This has always been a task that requires a strong team effort to ensure the best predictions and estimations are performed to penetrate the desired reservoir development zones and achieve the expected production rates. Numerous iterations with a high level of interaction between Reservoir Management, Reservoir Simulation, Reservoir characterization, Geology and Geophysics are expected when planning a new well or a difficult sidetrack.Each member of the well planning team has his/her own environment along with dedicated standalone software tools. Today, with the introduction of the Intelligent Field center to provide the collaboration environment for the involved expertise along with the proper tool to offer a strong integration of different data sources in a single software environment that allows a team of field geologist, geophysicist, reservoir and simulation engineers to evaluate the best prospects available in planning any new drilling opportunity, furthermore the team is able to choose the best well azimuth and inclination based on reservoir properties and performance.This paper discusses a newly integrated well planning process utilizing a collaboration environment to review seismic, well log cross sections, historical production and simulation predictions enabling the well planning team to place their gas wells using a reservoir 3D viewer, incorporating the reservoir simulation model, and run various cases and sensitivities. In This paper, full examples illustrate how effective software integration can optimize the time required to plan a new well without overlooking any important aspect. In addition, the paper discusses the lessons learned from this experience and how this approach changes the mechanism of an integrated well planning team working together.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.