The long-standing issue of non-pre-emption in ‘multi-period’ production/maintenance (P/M) scheduling has always been a challenge and this has been the focus of many researchers. Recently, the Contiguous-Cells Transportation Model (CCTM) was proposed to address this problem. However, the CCTM is limited to non-pre-emptive P/M scheduling decision situations where only one objective is of concern. The multiple objective non-pre-emptive P/M scheduling are encountered more frequently in the real world than the single objective case. This study proposed the Multi-Objective Contiguous-Cells Transportation Model (MOCCTM) and the solution procedure for handling multi-objective cases of non-pre-emptive production/maintenance scheduling. The variables and parameters of the CCTM were adopted with modifications to cater for the multi-objective requirements. A composite multiple-objective function was formulated by employing multi-objective optimisation techniques of assigning weights to objectives and normalisation of objectives. An algorithm similar to the conventional least cost method was developed for the solution of the MOCCTM. A bi-objective non-pre-emptive maintenance scheduling problem of 5 production machines across an operation and maintenance planning horizon of 10 periods was used to demonstrate the application of the MOCCTM. The MOCCTM is a good approach to solving multi-objective P/M scheduling problems in a non-pre-emptive environment.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.