In this study, the buffer allocation problem (BAP) in homogeneous, asymptotically reliable serial production lines is considered. A known aggregation method, given by Lim, Meerkov, and Top (1990), for the performance evaluation (i.e., estimation of throughput) of this type of production lines when the buffer allocation is known, is used as an evaluative method in conjunction with a newly developed dynamic programming (DP) algorithm for the BAP. The proposed algorithm is applied to production lines where the number of machines is varying from four up to a hundred machines. The proposed algorithm is fast because it reduces the volume of computations by rejecting allocations that do not lead to maximization of the line's throughput. Numerical results are also given for large production lines.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.