The Meninting Dam under construction on Lombok Island, West Nusa Tenggara, Indonesia, requires a good planning to build a diversion tunnel to support its development and mobilization. The diversion tunnel is planned to be built through rocks with medium to poor rock mass quality. The planning stage involves various parameters, i.e., the rock mass classification, using either the RMR or GSI method. Converting values from one method to another makes planning work easier. However, the constraints found were the limitations of the observational data, such as discontinuity conditions. The objective of this article is to discuss the alternative depiction of discontinuity conditions in rock mass using RMR method. An alternative equation was developed to obtain a prediction model for determining the RMR value, based on GSI data. The evaluation showed that the mathematical models developed in this research had a small gap of error compared to other values. The models then can be used to predict RMR value based on GSI data and vice versa, with a higher degree of accuracy and precision according to the actual rock surface conditions, especially in the construction site of diversion tunnel at Meninting Dam.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.