-This paper estimates the life cycle cost(LCC) of a propulsion control system using the maintenance information in the high speed train(KTX-1). Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Until now, most life cycle cost of the system has been studied as a whole system viewpoint. But in case of railway industry, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. This paper proposes the life cycle cost model which fitted to estimate life cycle cost (LCC) using maintenance information manual. As a result, LCC on propulsion control system increased moderately expect for periodical time when major parts are replaced at the same time. Results will be reflected in the development of domestic products.
-Conventional power conversion unit that is a major part of the propulsion system has applied GTO thyristor as a switching semiconductor device of main circuit since introduction of the 8200 electric locomotive. But problem that quick maintenance is difficult and its cost is increasing occurs because major components of the power conversion unit are slowly discontinued. To solve these, in this paper, it was analyzed the response characteristic of the propulsion system modeling of the 8200 electric locomotive using IGBT which is applied recently to ensure propulsion control technology. As results of response for a Propulsion system modeling, it show that a power conversion unit is controlled by PLL(Phase-locked loop) and SVPWM(Space Voltage PWM) respectively.
-This paper presents the result of life-cycle cost (LCC) estimation for domestic products propulsion control system (motor block unit) of KTX-1 considering periodic maintenance. Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Life cycle costing includes the cost of concept design, development, manufacture, operation, maintenance and disposal. To estimate LCC for domestic products motor block unit, it was analyzed physical breakdown structure (PBS) on motor unit in view of maintenance cost and unit cost etc. As a results, life cycle cost on motor block unit increased moderately expect for periodical time when major parts are replaced at the same time. hereafter this results will be reflected in the domestic products being developed.
-When the high speed train (KTX) departs from station in the high-speed line, intermittent on-board signal disappearance causes a hindrance of the operation punctuality. Therefore, we have a research objective to verify the causes of hindrance and to find an improvement plan. process of research, when train leaves the station, we applied sand on the rail to improve adhesive power, that sand has an effect on the ATC(Automatic Train Control) signal wave. We detected & analyzed signal waves which is came from detecting device by changing operation condition in accordance with sand material overage detection to be achieved.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.