The use of information systems requires special management and management, so this system is commonly referred to as a management information system. In it there are various activities ranging from system planning, maintenance, to measuring performance. In running a library information system, software and hardware are needed as well as humans as operators. The above components must be activities that are interconnected so that the library can run smoothly. To determine whether the components of the information system are running well, it requires an evaluation process. The purpose of this study is to measure the level of satisfaction of system users and to determine the strengths and weaknesses of the system in the use of library information systems. The method used is the analytical method PIECES Framework, which consists of several points of analysis, namely: Performance, Information and Data, Economics, Control and Security, Efficiency, and Service. Where each analysis point is a reference for evaluation and analysis of information systems. The results of this study are web applications that are able to analyze the level of user satisfaction with the library information system using the PIECES Framework analysis method and equipped with a satisfaction level reporting chart of the system measured in the 2018 period.
Perkembangan ergonomic dewasa ini telah sampai pada konsep yang sifatny amakro, hal ini dikarenakan kebutuhan yang sifatnya global. Namun industri manufaktur yang tidak mampu mengelola sumber daya dengan baik dan lemahnya manajerial akan berdampak pada penurunan produktivitas. Lingkungan kerja sehat dipengaruhi oleh ruangan yang ergonomis dan penggunaan serta penyimpanan bahan kimia harus ditangani dengan tepat. Serta pengetahuan tentang pentingnya Alat Pelindung Diri (APD) harus lbih dipahami oleh pihak perusahaan/ percetakaan karena hal ini akan berpenagaruh terhadap keselamatan dan kesehatan Kerja (K3). Pada penelitian ini menggunakan software smart PLS untuk mengolah data. Telah diperoleh bahwa penerapan APD terhadap produkvitas kerja dengan pendekanatan ergonomic partsipatory dan menunjukkan hasil yang signifikan dimana setiap variable nilai CR diatas 0.6 dan nilai setiap loading faktornya berinilai diatas 0.5 yang artinya setiap indicator yang terbangun berpengaruh terhadap setiap variabelnya.
Determining the optimal number of employees in a company is a basic condition that must be concern into account when drafting a work plan. The work design process ultimately aims for balance the physical and mental aspects of humans in completing certain tasks so that. Determination of the number of employees whit the existing workload will support employees performance in perform their duties optimally. The purpose of this research is to determine the optimal number of salesman based on the workload calculated using the Full Time Equivlent method. Based on the results of research at PT. Xyz used the method FTE is know that the workload of the 4 salesman is classified as overloaded. Where is sales I has a workload of 1.48, sales II has a workload of 1.70, sales III has a workload of 1.66, sales IV get a workload of 1.42. Based on the table of labor requirements to the FTE value, the number of initial salesman was 4 sales and the addition of the number of salesman is as many as 10 salesmen. So, the optimal number of salesmen in Makassar city is 14 salesmen.
Pemborosan yang terjadi dapat mengakibatkan kerugian pada perusahaan, salah satu contoh kerugian yang dapat ditimbulkan karena adanya pemborosan adalah waktu penyelesaian produk yang lebih lama dibandingkan dengan yang sudah direncanakan tidak memberikan nilai tambah (non value added), maka yang menjadi tujuan untuk menghilangkan pemborosan di lantai produksi, dengan merancang VSM (Future State Map) yang sesuai dengan kondisi perusahaan dengan mengintifikasi weste dengan menggunakan metode 5W- 1H ( what, who, where, when, why dan how) Setelah dilakukan perancangan future valuue stream map sehingga waktu (current state map) menunjukkan bahwa total lead time adalah sebesar 2890.5 menit dan proses pada future stream map lead time sebesar 2.740,5 menit maka dari itu ada pengurangan proses waktu lead time sebesar 150 menit dengan takt time dari 0,10 menit/ unit, kapasitas produksi terpenuhi 359 ton/hari.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.