This paper describes the 400 kV AC submarine link under the Dardanelles Strait composed of 12 submarine armoured single-core cross-linked polyethylene (XLPE)-insulated cables (plus a back-up power cable). The link consists of two parallel-operated double-circuit links named Lâpseki-Sütlüce I and Lâpseki-Sütlüce II. The transmissible power is 4000 MW (1000 MW per circuit) and the average length for a single-core cable is about 4.6 km: the submarine cables are part of overhead lines. This paper gives a wide account of the cable installations and, chiefly, of the cable protections on the seabed: different protection choices were extensively used (i.e., water jetting and mattressing).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.