Due to the increase in requirements for transport facilities, there is a need to strengthen them. The article is devoted to the analysis of reinforcement methods for load-bearing reinforced concrete structures of transport structures. The author notes in what period of the bridge’s life, it needs reinforcement, what difficulties are associated with reinforcing structures, and what are the main amplification methods that exist today. In order to select the optimal amplification method, it is necessary to carry out verification calculations, study the zone requiring amplification, take into account how many times the load-bearing capacity will increase and whether additional force effects will occur. This article describes the advantages and disadvantages of reinforcing by welding additional reinforcement and bonding composite material. The author calculated the amplification of the extended zone of the T-section reinforced concrete beam of the superstructure with additional reinforcement and composite materials. Based on the calculations made, recommendations have been put forward on the relevance of using one or another method of reinforcing the structure.
In the article, the authors describe the methodology for determining the length of piles according to ASTM D5882. The authors of the article describe the situation that arose at one of the sites in the city of Tyumen when, when digging a pit, a previously constructed pile field with a grillage was discovered. The authors examined the pile field in order to determine the length of the piles. The length of piles immersed in the ground was determined by the method of acoustic wave excited in a pile by impact in accordance with ASTM D5882 Standard Test Method for Low Strain Impact Integrity Testing of Deep Foundations. The measurement method is based on the property of an acoustic wave being reflected from the interfaces between media with different acoustic impedances. The article describes the methodology for determining the length of piles with further processing of the measurement results. The main conclusions are formulated based on the results of the work on measuring the length of piles by the method of an acoustic wave excited in a pile by impact.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.