During a long-term construction project, numerous stakeholders participate and collaborate with each other. In such scenario, the processes of creating, storing, and managing project documents are highly complicated. Due to the nature of the construction projects, problems arise in document management such as loss of documents and difficulties in tracking, which can result in claim failure and huge damage. This study proposes a method to efficiently record, search, and manage construction documents that can protect legal rights in preparation for claims/disputes. This study designed a system that can generate, transfer, and synchronize blocks based on email communication whenever an event occurs. It also provides functions such as document search, history tracking, automatic extraction of related document, and authenticity verification for document management. The findings of the study have established that reliability of documents is secured during the recording, storing, and managing processes, and thus claim-and dispute-supporting tasks are supported.
Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques for estimating delay impacts using the impacted as-planned (IAP) method. A sample network was introduced as an example to discuss several concerns. The advantages and limitations of each approach were identified, and recommendations were given for each approach. When inserting an activity or activities representing delay events in IAP, it is necessary to use both constraints and logical relations among delay events, their logical predecessors, and successors. Constraints representing the actual date of delay events are the simplest and easiest. However, constraints should not be used in “single insertion” and “inserting only owner- or contractor-caused delay” approach. In addition, in the case of using constraints, it is critical to ensure that the impact of delay events is less than the duration of those delay events. Constraints should be avoided in this scenario, and delay events should be logically connected to their logical predecessors and successors without constraints. This study also identified through an example that inserting delay events only by logic can cause wrong analysis results. The results of this study will be helpful for delay analysts in identifying what kinds of problems occur in IAP methods and how to prevent those problems.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.