Industrialised Building System [IBS] is a new method that used prefabrication components in building construction as an alternative towards enhancing construction performance. The Construction Industry Development Board [CIDB] embraced the IBS method to enhance productivity and building quality, reduce wastage on site, increase occupational safety and health, and reduce overall cost of construction. Currently, most of the IBS project developments in Malaysia are still adopting traditional procurement system. However, traditional procurement system has been criticised for its fragmented procedure to project delivery in terms of integration and collaboration of the project team. As a result of that problem, a number of issues have recently arisen such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. The purpose of this research is to identify challenges of the current procurement system and to investigate the possibilities of implementing innovative type of procurement method for IBS implementation. A deductive research approach was adopted. Reviewing relevant literature before embarking into any academic research project is one way of exploring a known theory in a holistic manner. It also appears to be one of an essential feature to create a firm foundation for the research. Based on extensive literature reviews; this paper describes what are initiatives that have been taken from developed nations which are known as earlier IBS adopters and through the findings these experiences may shed some light on the type of procurement that have been adopted. This study was conducted among Grade 7 IBS contractors in Malaysia to gain further clarification on the immensity of the issues as well as assessing the research instrument. The findings from this study reveal that financial matters, lack of early involvement, lack of integration and coordination, knowledge and understanding, role and responsibility, risk liability, communication and information, attitude and relationship matters are challenges embedded in the existing procurement approach in adopting IBS. Suggestion on how innovative type of procurement method such as Separation of IBS from Main Contract, Partnering and Integrated Project Delivery [IPD] will be able to minimise the fragmentation gaps will be concluded.
Malaysian housing developers produce a range of products that has the characteristics of being large, expensive and durable. Nonetheless, the protracted development process exposes the developer to a high level of risk. Previous product development studies had focused on the technical elements of development rather than managerial aspects. This paper examines the contribution of product characteristics to the competitive advantage of Malaysian private housing developers. Using semi-structured snowball interviews, this qualitative study aims to elucidate upon the success factors of private housing developers. Ten successful housing developers were chosen for this research. The findings suggest that successful project management coupled with a product selling price that reflects the location, quality and innovativeness of the product, count toward the developer's reputation and branding. This paper expands the academic housing development literature by providing specific and in-depth information on housing developer products in Malaysia.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.