The objective consists in optimizing the fuel consumption of a power station of small cogeneration multi machines while minimizing generated pollution. At first, a study carried out on the strategies of Economic Dispatch , was used to us to solve the unit commitment problem, whose main aim is to determine the optimal schedule of online generating units so as to meet the power demand at minimum operating cost under various system and operating constraints. This work was carried out by Secant method combined with Improved Pre-prepared Power Demand (IPPD) table which obtains the unit status information and then the optimal solution is achieved by Secant method at each power demand for 24 hours. The comparison of results of the proposed method with the results of classical method, by Matlab/Simulink, shows that the proposed approach provides qualitative solution.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.