Taking Motianling tunnel in Chongqing as an engineering background, the monitoring and measurement scheme is proposed for the extra-long tunnel under complex condition, and the field data and the numerical simulation results is analyzed. The results indicates that, the selected cross-section reflect overall state of the Motianling tunnel, and the structure safety monitoring during operation is considered; by tunnel internal and external observation, it is found that the tunnel face in F22 fault zone may not stay stability, because the monitoring information receive feedback timely, and the supporting measures is proper, the surrounding rock stay stability when excavating; for the typical section, the surrounding rock contact pressure is greater than interlayer pressure, primary lining sustains most of the load ,and the secondary lining plays an assistant role as safety reservation; the maximum of anchor axial force and surrounding rock pressure occur at tunnel crown. By monitoring and numerical simulation, the dynamic excavation and design is realized, the Motianling tunnel is achieved safely and successfully at last.
To reduce the impact on water resource and the environment, the ‘controlled drainage principle’ is complied with when designing waterproof and drainage system of tunnel in recent years. For deep tunnel in Water-soaked Karst Stratum, the lining would sustain high water pressure that was caused by the unreasonable design of waterproof and drainage system. Taking a railway shield tunnel as an engineering background, the water shut-off effect of grouting circle, minimum controlled discharge of tunnel and the water pressure of lining properties were studied. The results indicated that, under the condition of high initial water pressure and adequate groundwater recharge, to achieve the desired water shut-off effect, the permeability coefficient of grouting circle should be less than that of surrounding rock over one quantitative grade; the water pressure of lining decreased with the increase of discharge, and showed a linear relationship; the lining could meet the requirement on the design water pressure load, when the permeability coefficient of grouting circle less than 1/20 of the surrounding rock’s, and the controlled discharge greater than or equal 1/2 of uncontrolled discharge; the full-sealing waterproof lining would sustain initial water pressure and the calculation value of water pressure couldn’t be discounted, if the grouting wasn’t waterproof.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.