Northwest Java Basin is one of the Indonesian basins that has the potential of hydrocarbon reservoir. A petrophysical analysis plays a role in determining the physical properties of reservoir rocks such as shale volume, porosity, and water saturation zones which is to analyze the hydrocarbon zone possibilities (net pay). A qualitative analysis and correlation of rock lithology study were carried out at seven wells, while a quantitative study was performed by calculating the volume of the shale with a linear method, density-neutron porosity, and water saturation using simandoux equation, then zoning the prospect zones was finally done. Based on the calculation and data analysis, Vsh cutoff value obtained is 23%, the porosity is 10.6%, and water saturation is 71%. Then, the zones of hydrocarbon prospects were recovered, that are the PI-08 wells (9
Exploration well GH-02 will be drilled directionally at an inclination of 44º and a target of 5920 ft MD or 4840 ft TVD. So that the drilling process can be safe, the rig capacity must be determined optimally so that it is not over capacity which causes higher rig rental costs and also low capacity which causes disruption of the drilling process. The main components that influence the calculation of the horsepower required by the rig are the hoisting system, the rotary system, and the circulation system. The amount of horsepower required in the hoisting system is influenced by the lifting velocity, the hook load and the efficiency factor. While the rotary system is influenced by the amount of rpm and the target depth. Circulation system is influenced by the pump flow rate and pressure loss along the circulation system. The total horsepower required can be calculated by adding up the horsepower from the hoisting system, rotary system, circulation system, plus the safety factor of 100-250 HP for rigs with more than 1000 horsepower. The drilling time is designed optimally so that not much time is wasted which can cause the drilling costs to increase expensive. The amount of the rig rental cost is obtained from the rig rental cost per day with the planned drilling time. The results of the case study calculations show that the rig capacity is 1500 horsepower, drilling is carried out for 22 days and the cost of renting the rig is 660000 USD
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.