At GLC project, pair of liner accelerators will be built, facing each other as 33km total length and needs 18000pcs of 60cm X band accelerator structure. Now the manufacturing process of it is diffusion bonding with 72 hours, but we have to reduce process time. And so we tried direct bonding for 60 pcs OFC disk blanks with pulse current. Concerning this experiment, we developed new equipment which was an elastic electrode (CCE) for direct bonding. Then we got satisfied results on a basis experiment for accelerator structure manufacturing.Key Words: direct bonding, pulse, cell, electrode, accelerator structure
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.