By 2020, the Trinity River Authority of Texas (TRA) Central Regional Wastewater System (CRWS) plant is expected to face peak flows that are 45% greater than the current peak flow of 405 mgd. When evaluating the plant's influent facilities, it became clear that TRA could not risk long lead times and schedule delays that could result from typical design-bid-build procurement methods. AECOM recommended pre-purchasing equipment as a part of three separate, consecutive construction contracts at the influent structures of the CRWS plant.The equipment was purchased within budget and installed within aggressive timelines. These examples of pre-purchasing show how an owner can innovatively procure equipment when the timeline requires it. The most important phrase to remember is, "coordination is key". Whether you are looking to accelerate a project schedule, minimize uncertainty that comes with traditional procurement, or have increased control of cost and equipment selection, pre-construction purchasing may be your solution.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.