Lately, hydraulic Fracturing become common stimulation to improve economic by increase production and adding reserve through unconventional play from tight sand reservoir. The fracturing treatment creates highly conductive pathway to enhance production and well drainage which lead to add reserves. Mostly, Hydraulic Fracturing treatment had been performing in new development wells of infill wells. After successful resulted hydraulic fracturing campaign in new infill wells, there was a trial to perform hydraulic fracturing in existing well thru existing tubing completion. First well which was selected as first to perform remedial frac, thru tubing hydraulic fracturing is consider as a cheaper way to perform rigless hydraulic fracturing compare to hydraulic fracturing with rig. The main challenges during operational come from limitation of existing completion, several adjustment in design and operational should be perform to optimization during fracturing job. This paper presents the experience including fracturing limitation and fracturing design during performing first thru tubing hydraulic fracturing in tight sand reservoir in Offshore North West Java.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.