In response to the requirement of national thermal power flexibility reform policy and the need of regional central heating development, a 350MW supercritical unit in a power plant has been transformed with zero output technology of low pressure cylinder. In this paper, the scope and content of low pressure cylinder zero output transformation are discussed, peak shaving and heating capacity after transformation are analyzed, the difference between operation effect and calculation result after unit transformation is compared by test, and the matters needing attention in future operation are given, which provides reference for technical transformation of low pressure cylinder zero output of other power plant units.
This paper introduces the technical route of the zero output heat supply transformation of low pressure cylinders in Shandong Province, the operation after the transformation, the impact on power grid dispatching, and the constraints on the normal operation of some units after the transformation, providing technical support for power generation enterprises to accurately implement the “three transformation linkage” transformation scheme and the accurate dispatching of the power dispatching center
This paper introduces the total heating capacity, total installed capacity, heating area change trend and unit transformation of direct regulating heating units in Shandong power grid in recent years. According to the operation data of condensing pumping units, back pressure heating units and cylinder cutting units in previous heating seasons, the heating and peak shaving performance of different types of cogeneration units of the same type, grade and grade in heating seasons are analyzed, It is convenient for the power grid dispatching department to more reasonably and orderly arrange the unit mediation plan of the province's thermal power plants according to the online situation of new energy and external power. At the same time, it is a reference for power generation enterprises to carry out flexible transformation according to the actual situation of units during the 14th Five Year Plan period, and take into account the low load peak shaving performance of units or the whole plant while increasing heating capacity.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.