Flow assurance problems in flowlines and pipelines include hydrate formation/blockage, paraffin wax deposition, asphaltene deposition and scale formation on the walls of pipelines, all of which impede the flow of produced hydrocarbons and associated well fluids. Conventional means for pipeline remediation to remove these restrictions include periodic and extensive pigging (either through flowline pigging loops or from subsea pig launchers), chemical injection through umbilicals and high performance thermal insulation (syntactic foam, pipe in pipe, and/or pipeline bundles).This paper presents a review of the types of pipeline restrictions and blockages, and innovative solutions for remediation, including remediation planning techniques, chemicals, debris pick-up gels and intrusive intervention. The intrusive pipeline intervention system conveys fluids directly to the area of any particular problem, using composite coiled tubing and a pipeline tractor. Two significant factors that restrict the use of an intrusive flow remediation system are the design of the production facility and the reach capability of coiled tubing. Past and current flowline designs have not considered the use of intrusive remediation systems, and to-date the use of coiled tubing as the conduit for an intrusive system has not been practical beyond a total distance of 9000 feet. Advances in composite technology have enabled the manufacture of high performance light coiled tubing, which eliminates or reduces the flowline-to-coiled tubing drag force, allowing for longer distance intervention with existing tractors. Subtle flowline design changes enable intrusive blockage remediation systems to yield significant benefits.Maintaining flow of oil and gas through production flowlines is vital to successful offshore and onshore operations. Flow assurance engineering has become a significant part of the feasibility and conceptual design stage of projects, and systems such as active heating employing either electric power or heated fluids have been considered as a method for assuring optimum flow. The application of the flow assurance solutions adds substantially to project CAPEX. In the case of chemical injection or pigging, OPEX is increased, and in most cases operational pigging causes a reduction in production during the pigging operation. In deepwater oil and gas developments the additional cost can be significant, particularly for long tiebacks. The remediation solutions presented herein obviate the need for these high CAPEX and OPEX solutions, without increased risk of long term flowline blockage.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.