A series of tests on filigree slab joints was performed with the aim of assessing whether such joints can be reliably used in the construction of two-way spanning reinforced concrete slabs. The test results were compared with code requirements. Adequate joint performance is shown to be achievable when the joints are appropriately detailed.Further research is recommended for the formulation of a more generic understanding when the design parameters are varied from those studied in this work.
The construction of the Leadenhall Building in London, UK has presented many challenges to the project team due to its distinct geometry and constrained city centre site. Conventional construction techniques would have resulted in a slow build programme, and caused major disruption to the local environment. Hence contractor Laing O’Rourke developed a new composite flooring solution for the project in collaboration with Arup and BRE, consisting of lightweight precast concrete elements that were dowelled and grouted together integrally with the supporting steelwork. This paper presents the new patented solution that was developed and the research and development that was undertaken to demonstrate its technical viability. Small-scale shear and bond tests, and large-scale load and dynamic testing were undertaken to demonstrate the system’s performance against the technical requirements defined for the project by the clients, British Land and Oxford Properties. Lessons learnt from manufacturing, installation and on-site dynamics testing are discussed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.