The paper presents the experience of building and structure strengthening in Tyumen soil conditions which are often presented by a soft water saturated clay and sand layer of the quaternary period. All buildings mentioned in the paper had uneven settlements due to complex engineering and geological conditions and the wrong choice of foundation type. Thin drilled injection piles with a diameter of 200 mm were used for foundation strengthening. All the piles were installed on the solid soil base during the drilling process regardless of the depth of its location. No rules have so far been approved to calculate the bearing capacity of thin drilled injection piles. That was the reason for defining the drilled injection pile bearing capacity at every facility. The paper describes the methods and test results obtained in the study. It was found out that all piles had unexpectedly high bearing capacity. The paper also contains the results of geotechnical monitoring before and after base building strengthening by drilled injection piles which show the current decrease of settlements and the efficiency of this base strengthening method.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.