In the early year 2000, the Santiago's subway network was comprised of not more than 40 km and 46 stations with only about a half of its network being underground construction, mainly cut and cover boxes. Nowadays, with the additional 17.5 km of new line extensions (Line 1 and 5), the subway network will achieve a considerable expansion reaching a total length of 104.5 km and 108 stations, with over 60 km of shallow mined tunnels and more than 70 underground stations. The construction of the new extensions of Line 1 (3.3 km) to the East and Line 5 to Maipu/West (14.2 km) have started in the beginning of 2007 and are planned to be completed in 2009. The mined tunnel sections of both lines include twelve large shallow underground stations and several intermediate ventilation and emergency exit shafts and tunnels. The present article describes some relevant aspects associated to the design and construction of shallow tunnels for the Metro Santiago and gives an insight into the current ongoing construction works of the new Line 5 extension.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.