The paper deals with simulating the circumstances of switching surge and trigger current at switching-in of the T402 autotransformer recently installed in Križovany, with the tests conducted by means of ATP (Alternative Transient Program) simulation software for simulating transient electromagnetic phenomena. The target has been to determine temporal curves for the most critical surge instances against earth and between the phases and the curves for trigger current with and without surge limiters connected, and to determine by means of simulations the size and statistical frequency of switching surges and based on a controlled switching simulation, to describe the elimination of transient phenomena during the process and in reference to the simulations and to operating manual for the PSD02 Siemens control unit, suggest the required configuration settings for the unit. K e y w o r d s: switching surge, trigger current, substation, transformer, T402 transformer, EMTP -ATP, Križovany, surge current
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.