Indonesia is a large country that is widespread with it’s islands and isa country traversed by the Equator, so sea transportation has animportant role to play in connecting one area to another, consideringthat Indonesia has a very wide ocean. One of the means of seatransportation that is widely used by the community is the ferry. Ferryis a type of sea transportation that can be used as passenger andgoods transportation using certain routes or routes. With theexistence of the Ferry port, it can increase the acceleration ofdevelopment in the area, especially Amolengo Village, KonaweSelatan Regency.The Amolengo ferry port is a port that serves the crossing ofpassengers and goods that connects the South Konawe mainland andits surroundings with Buton Island, where the destination port is Pureport. The quality of good service provided is one of the determiningfactors for the success of the company. The research method isarranged by interviewing respondents by answering the questions onthe questionnaire. The analysis was performed using ImportancePerformance Analysis (IPA) and the Customer Satisfaction Index (CSI).The results of this study indicate that the consumer satisfaction indexon the performance of the Amolengo - Pure Ferry Port, SoutheastSulawesi Province is 84.6% and is in the range 0.81 - 1.00 indicatingthat consumers are very satisfied with the service quality of theAmolengo - Pure Ferry Port, Southeast Sulawesi Province.
Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increasedproductivity will reduce work time, and will reduce costs, especiallylabor costs so that the minimum labor cost is obtained (labor costs)to get competitive prices both for auction and implementation. Thepurpose of this study is to analyze the labor productivity time incompleting 1 m2 of masonry bricks and to analyze the productivityvalue of brick masons in completing work activities in the constructionproject of the Mandala Wangi 2 female dormitory. The results showedthat the time required to complete 1 m2 of brick laying work was 41.13minutes on average. The productivity of the artisans working on the 1stfloor is an average of 1.45 m2/hr. Meanwhile, the productivity ofcraftsmen working on the 2nd floor is an average of 1.47 m2/hr.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.