An inductively coupled plasma mass spectrometric (ICP‐MS) technique method is developed for simultaneous determination of Li, Cr, Mn, Fe, Ni, Co, Cu, Sr, Ag, Cd, Ba, and Pb at trace level in caustic soda. Operational parameters of the instrument were optimized and suitable accessory (argon gas dilution) was used in the method. Direct aspiration of high total dissolved solids (TDS) samples (beyond 0.2% TDS) and highly alkaline NaOH is not suitable for the instrument; therefore, strategy of neutralization of NaOH by HNO3 was adopted to handle its high alkalinity. Suitable internal standards of low, mid, and high atomic masses were used with external calibration. Features such as matrix matching, calibration verification, interference correction, etc. were undertaken in this work. Neutralized caustic soda samples were spiked with the analytes with lower, middle, and higher concentration. The results of spiking with 30, 70, 140, and 200 ppb were examined. The method exhibited excellent accuracy and precision.
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site.
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.