In many industries, manpower shift scheduling poses problems that require immediate solutions. The fundamental need in this domain is to ensure that all shifts are assigned to cover all or as many jobs as possible. The shifts should additionally be planned with minimum manpower utilization, minimum manpower idleness and enhanced adaptability of employee schedules. The approach used in this study was to utilize an existing manpower prediction method to decide the minimum manpower required to complete all jobs. Based on the minimum manpower number and shift criteria, the shifts were assigned to form schedules using random pick and criteria-based selection methods. The potential schedules were then optimized and the best ones selected. Based on several realistic test instances, the proposed heuristic approach appears to offer promising solutions for shift scheduling as it improves shift idle time, complies with better shift starting time and significantly reduces the manpower needed and the time spent on creating schedules, regardless of data size.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.