The research aims to determine the standard working time on the cutting and packaging of glutinous jenang "JELITA". The cutting and packaging part is the part of the production process that determines the amount of production produced. The determination of standard time is done through the analysis of working methods and working time in those parts. The method used is the calculation of the standard time in the determination of operating process chart, left right handed chart, and flow diagrams. The results showed that improvements in working methods based on work maps were obtained based on proposed improvements. The proposed improvement results in the effectiveness and efficiency of the operating process time up to the layout on the work system, while in the determination of the default time produces 52 seconds of the standard time of the cutting process and 226 seconds of the raw time of the packaging process.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.