The Koralm Railway Line represents an essential section of the Pontebbana corridor between Graz and Klagenfurt. It creates new capacities and significantly improved conditions for the freight transportation. Furthermore, the travel time of the passenger traffic will be considerably reduced. The heart of the Koralm Railway Line is the Koralm tunnel with a length of approximately 32.8 km. During excavation of the partly extremely demanding neogene sections of the investigation tunnels for the Koralm Tunnel, valuable experiences can be gained concerning the drainage and the closely related excavation behaviour, in addition to the geological-geotechnical insights. In the paper, the predicted mountain water conditions of the tunnel sections within neogene sediments as well as experiences with the implemented dewatering measures are described. These experiences strongly influence the detailed design of the future main tunnel structure.
Systematische Entwässerungsmaßnahmen im
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.