Lot splitting is a technique for accelerating the flow of work by splitting job lots into sublots. In this paper we investigate the lot splitting scheduling problem in a two-machine flow-shop environment with detached setups and with batch availability. The performance measure considered is the average flow-time which is indicative of the increasingly important manufacturing leadtime. Our contribution is both theoretic and practical for the case of general (not necessarily equal) sublots. We identify properties of the optimal solution and develop a solution procedure to solve the problem. We then present a computational study which indicates that our solution technique is very efficient.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.