This article presents the execution method of a cable stayed bridge over the Vistula River in Krakow together with FEM-based computational simulations carried out during the design process. The performed calculations concern the global system in its final stage and in the construction stages as well as local analysis of construction details. The obtained results made it possible to work out efficient solutions that contribute to a significant reduction of the project cost and execution time shortening.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.