Recently, interest in solar energy has increased for many reasons, however, connecting solar power stations in distribution networks may cause many problems, so it was necessary to study the impact of connecting photovoltaic systems to distribution networks to provide solutions feasible in practice. This study includes analyzing the performance of a solar power plant with a capacity of 17.2 kWh connected to the low voltage network of the distribution networks according to Egyptian PV-LV code-2014, simulation using MATLAB/Simulink, and cost analysis for connecting SSPV 17.2 kW to LV distribution networks. The system model was built on MATLAB/Simulink and simulated under daily weather conditions to test the system's operational performance. Power quality parameters are measured using C.A. 8336 power quality analyzer at the inverter output side for the PV system at the Minya Electricity Distribution Sector in Minya Governorate, Egypt. The system produces a 29.314 MWh and reaches its initial cost in 7.2 years. The electrical energy produced by the system is directly injected into the low voltage network for loads of the Minya Electricity Distribution Sector building without batteries or storage devices (on-grid).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.