Japan Atomic Energy Agency (JAEA), as the Japan Domestic Agency (JADA), has the responsibility to procure 9 ITER toroidal field (TF) coils, 19 TF coil (TFC) structures, 25% of the TF conductors and 100% of the central solenoid (CS) conductors in ITER and, in addition, CS and equilibrium field (EF) coils including their conductors in JT-60SA, which is being developed as a satellite facility for ITER. In ITER, more than 90% of TF conductor fabrication was completed and finalization of the manufacturing procedure of TF coils is in progress through full-scale trials, such as trial fabrication of dummy double pancakes (DPs). In JT-60SA, fabrication of the EF4 coil was completed and the EF5 and EF6 coils are being assembled.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations鈥揷itations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.