This paper presents a fuzzy extension of the simple assembly line balancing problem of type 2 (SALBP-2) with fuzzy job processing times since uncertainty, variability, and imprecision are often occurred in real-world production systems. The jobs processing times are formulated by triangular fuzzy membership functions. The total fuzzy cost function is formulated as the weighted-sum of two bi-criteria fuzzy objectives: (a) Minimizing the fuzzy cycle time and the fuzzy smoothness index of the workload of the line. (b) Minimizing the fuzzy cycle time of the line and the fuzzy balance delay time of the workstations. A new multi-objective genetic algorithm is applied to solve the problem whose performance is studied and discussed over known test problems taken from the open literature.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.