Abstract. The article considers potentially possible optimization solutions in scheduling while forming the annual production programs of the construction complex organizations. The optimization instrument is represented as a two-component system. As a fundamentally new approach in the first block of the annual program solutions, the authors propose to use a scientifically grounded methodology for determining the scope of work permissible for the transfer to a subcontractor without risk of General Contractor's management control losing over the construction site. For this purpose, a special indicator is introduced that characterizes the activity of the general construction organization -the coefficient of construction production management. In the second block, the principal methods for the formation of calendar plans for the fulfillment of the critical work effort by the leading stream are proposed, depending on the intensity characteristic.
Abstract. The article considers the possibility of identifying a group of companion activities in the annual construction program of organizations that does not lie on the critical path of the network model and which can be performed at the expense of the resource of subcontractors. The authors, using statistical methods, analyzed the experience of planning the production activities of a number of Russian and foreign construction companies on the territory of the Russian Federation to evaluate the application of the proposed optimization instrument without damage to the production process and without the risk of losing managerial control over the construction sites.
Abstract:The peculiarities of application of nodal method in the construction of large and complex industrial systems, the principles of the spatial division of the object on the technological, building and public spaces, the basic documents on the use of nodal method. As an example, we consider the use of nodal method in the construction machinery manufacturing enterprises. To this end, provides a general description of space planning and designs of single-floor and multi-floors buildings of this industry, the composition of industrial complexes and sub complexes engineering, their basic units and plots, schemes interlinkages units and energy supply. It includes steps for the development of complex aggregated network diagrams network diagrams and working with the justification of continuous work flow.
Abstract. The article provides negative trends of braking development of the investment process of creating buildings and structures and describes the dynamic system of the investment process and its components given the basis of domestic and foreign experience. It also categorizes the factors influencing the duration of the investment process, which are presented as procedural, engineering design and manufacturing. The article discloses the accounting procedures of these factors by measuring their information content with access to the formation of a rational structure of the investment process.
The present article examines the principles and aspects of building degree of mobility systems, the parameters defining the mobility. The dependences of determining the degree of mobility for different periods of construction.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.