Abstract-The paper describes simulations and a live test of the black-start procedure of an industrial power plant in the North of the Netherlands. After a total blackout of the Public Grid in the Netherlands, the restoration process shall start with so-called black-start units. To increase the probability that the re-energizing of the Public Grid indeed succeeds, the Dutch transmission system operator obliges units to prove their blackstart capability by performing a live test.A crucial step in the re-energizing of the Public Grid is the energizing of large transformers. Problems can be expected due to the inrush current of the transformers. For one such generating unit extended simulations of the inrush phenomena of the transformers and calculation of inrush currents and overvoltages were performed. Based on the simulation results well-founded decisions were made on the most suitable start-up procedure. The simulations were followed by live tests of the black-start procedure.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.