Majority of the high rate gas wells in the world are completed with Monobore completion system. The conventional sequences of running Monobore completion in giant gas field of SouthPars are in three steps: Run No. 1 which includes running Liner and liner hanger by drill pipes (DP) and normally followed by cementing behind liner, Run No. 2 which includes Running Tie Back production Packer with 15 ft Polished Bore Receptacle (PBR)by setting tool and DP and finally Run No. 3 which includes running completion string with upper seal stem and at the end complete the well with proper space out. Running of tie back production packer with setting tool and DP in one step and running upper seal stem by tubing in last step has some concerns (More Rig time, cost, safety, etc). Feasibility Study and research was carried out to check the possibility of combining the run No. 2 and 3 together. A new method has been developed and after successful surface test it was run in one of gas wells in South Pars giant gas field in Persian Gulf. All pressure tests after installation were satisfactory. This procedure saved almost 1.5 day of rig time and protected seals against mechanical damage while running in the hole.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.