Abstract. This paper recommends an aid to control discrepancies between drawings and documents in a project. The synchronisation may assist to better project's preparation and documentations. The causes of discrepancies that found out during the contract stage may lead to ineffectiveness of construction cost. The controlling process initiated from the tendering stage as to minimize the causal by any of the consultants which some items may left behind or possibly not describe fully without the thorough affiliation of coordination. The method to reduce discrepancies between drawings and documents is identified through Case Study based on 'hands on' project. The case study is focused on the preparation of architectural detailing. Therefore, the relationship of 2-Dimensional (2-D) Tender Drawings and bills of quantities is compared with the Elements of Building Works by Malaysian Standard Method of Measurement of Building Works Second Edition (SMM). The relationship study will simplify and supersede any unnecessary detailing. Thus, the application of the synchronisation method will result effectiveness of documentation during the contract stage by reducing discrepancies.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.