The paper illustrates a project carried out -between 2012 and 2013 -during which the first eni solar/fossil hybrid power plant -without any grid connection and energy storage systems -has been designed, built, started up and successfully operated -in Egyptian Western Desert -over more than 8000 hours. The purpose of the project was to enhance the efficiency of oil production operation by integrating solar with diesel fuelled power production.A patented Power Management Module (PMS) optimizes power flows among the components of the plant, namely Photovoltaic (PV) panels, Diesel Generator (DG) and sucker rods electric engines. The plant has demonstrated reliability in hostile conditions and capability to save diesel fuel and reduce CO 2 emissions up to 12 %. Further optimizations have also been identified, in order to enhance the performance of the whole system.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.