Drilling the 16-in. section in Minagish field wells in western Kuwait is among the most challenging well sections. Challenges include drilling through severe loss conditions, destabilized shale, and deteriorating hole conditions. These conditions can result in hole collapse or lost in hole of the drill string that requires sidetracking. The objective of project presented in this paper was to develop an engineered solution to drill through the difficult zones, lessen nonproductive time, and reduce the total well cost. The solution proposed was to use casing-while-drilling technology with a drillable bit and drill through the fractured dolomitic limestone and sandstone formation while simultaneously setting casing. The drillable casing-while-drilling bit was specifically designed and engineered to conform to the formations in the field. The drillable casing-while-drilling bit is manufactured with a material that can be drilled out with either conventional roller cone or fixed cutter bits. A plastering process was used, which smears the cuttings generated by drilling against the borehole wall, seals the pores or fractures in the formation, and helps reduce fluid losses while maintaining well integrity. The first successful 16 × 13.375-in. casing-while-drilling job in Minagish field reduced well delivery time for the operator and saved 27 rig days with substantial savings in the total well cost. The section was drilled successfully while encountering total mud losses through fractured dolomitic limestone and sandstone formations. Continued drilling managed to reduce losses with 30 to 50% returns and reached the target depth. Preventing the risk of losing the bottomhole assembly in the hole and alleviating the use of multiple cement plugs saved additional cost for loss-cure plugs to heal the loss-prone formations. After reaching the target depth, cementing, pressure testing of the casing, and drillout of the drillable casing-while-drilling bit using a rerun fixed cutter bit were performed successfully. On an average, eight wells are drilled per year in this field. With the successful implementation and the savings obtained by using this casing-while-drilling technology in the first test well, there is the potential for substantial annual cost savings, help the operator deliver wells in less time, and eventually increase production by increasing the number of wells drilled per year.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.