To accurately correct wind resistance acquisition problems during the ventilation reconstruction and then calculate the air quantity in various roadways, taking the reconstruction of ventilation system in Shaqu Coal Mine of China as an example, the "calculation-feedback-correction" mechanism for adjusting roadway wind resistance was proposed based on the Ventsim simulation technique. Wind resistance was calculated and the change of air supply-demand after the reconstruction of the ventilation system was analysed using the proposed mechanism. The reasonable isolation reconstruction program was verified. Finally, the relationship between opening area of air window and wind resistance after the isolation reconstruction was fitted by the Fluent technology and the optimal opening area of air window was calculated. Results show that: (1) the ventilator area of the south upcast inclined shaft 1# operates unstably after the isolation reconstruction; (2) when the opening area of air window reaches at least 3.28 m 2 , the ventilator works normally and steadily. The results also demonstrate that good ventilation effect can be achieved by adjusting resistance reduction and setting the optimal opening area of air window which conforms to the actual status of ventilation systems.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.