Enlighten-Research publications by members of the University of Glasgow http://eprints.gla.ac.uk Minimally invasive surgery with thrombolysis in intracerebral haemorrhage evacuation (MISTIE III): a randomised, controlled, open-label phase 3 trial with blinded endpoint
BACKGROUND:Minimally invasive surgery procedures, including stereotactic catheter aspiration and clearance of intracerebral hemorrhage (ICH) with recombinant tissue plasminogen activator hold a promise to improve outcome of supratentorial brain hemorrhage, a morbid and disabling type of stroke. A recently completed Phase III randomized trial showed improved mortality but was neutral on the primary outcome (modified Rankin scale score 0 to 3 at 1 yr). OBJECTIVE: To assess surgical performance and its impact on the extent of ICH evacuation and functional outcomes. METHODS: Univariate and multivariate models were used to assess the extent of hematoma evacuation efficacy in relation to mRS 0 to 3 outcome and postulated factors related to patient, disease, and protocol adherence in the surgical arm (n = 242) of the MISTIE trial. RESULTS: Greater ICH reduction has a higher likelihood of achieving mRS of 0 to 3 with a minimum evacuation threshold of ≤15 mL end of treatment ICH volume or ≥70% volume reduction when controlling for disease severity factors. Mortality benefit was achieved at ≤30 mL end of treatment ICH volume, or >53% volume reduction. Initial hematoma volume, history of hypertension, irregular-shaped hematoma, number of alteplase doses given, surgical protocol deviations, and catheter manipulation problems were significant factors in failing to achieve ≤15 mL goal evacuation. Greater surgeon/site experiences were associated with avoiding poor hematoma evacuation. CONCLUSION: This is the first surgical trial reporting thresholds for reduction of ICH volume correlating with improved mortality and functional outcomes. To realize the benefit of surgery, protocol objectives, surgeon education, technical enhancements, and case selection should be focused on this goal.
Abstract. With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of the proposed genetic.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.