4D CAD models to support the coordination of construction activities between contractors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
30
0
2

Year Published

2017
2017
2022
2022

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 37 publications
(32 citation statements)
references
References 22 publications
0
30
0
2
Order By: Relevance
“…As previously mentioned, many authors have defined 4D as 3D plus schedule from the beginning of the BIM studies, such as Hu and Zhang (2011) up to, more recently, (Zhang, Boukamp, and Teizer 2015;Zhou et al 2015). Moreover, the concept 4D is not only related to other concepts, but also to BIM, such as its utility on projects that involve many cobuilders, and is reflected by Trebbe, Hartmann, and Dorée (2015). Therefore, the potential of 4D CAD models has been widely acknowledged to avoid costly on-site improvisation, providing tools to better anticipate conflicts in the planning phase (Martínez-Aires, López-Alonso, and Martínez-Rojas 2018).…”
Section: Planningmentioning
confidence: 99%
“…As previously mentioned, many authors have defined 4D as 3D plus schedule from the beginning of the BIM studies, such as Hu and Zhang (2011) up to, more recently, (Zhang, Boukamp, and Teizer 2015;Zhou et al 2015). Moreover, the concept 4D is not only related to other concepts, but also to BIM, such as its utility on projects that involve many cobuilders, and is reflected by Trebbe, Hartmann, and Dorée (2015). Therefore, the potential of 4D CAD models has been widely acknowledged to avoid costly on-site improvisation, providing tools to better anticipate conflicts in the planning phase (Martínez-Aires, López-Alonso, and Martínez-Rojas 2018).…”
Section: Planningmentioning
confidence: 99%
“…In 2014, Faghihi et al demonstrated a novel approach to the development of construction sequencing for the installation of project elements by retrieving enough information from BIM (Faghihi et al, 2014). In 2015, Trebbe et al provided practical evidence for the advantages of 4D CAD model application within the construction process based on a case study of a major railway station renovation project in the Netherlands (Trebbe et al, 2015). In 2015, Lin proposed a web-controlled Construction BIM-based Interface Management (ConBIM-IM) system, which is capable of aiding engineers in improving interface information sharing and efficiency tracking in construction projects (Lin, 2015).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Dada la gran cantidad de stakeholders, los modelos nD resultan relevantes para la coordinación de las labores de los mismos, facilitando la comprensión y por tanto ejecución de las labores que cada uno de ellos debe realizar (Trebbe et al, 2015). Esto conlleva además un mayor involucramiento de los interesados, ya que existe una comunicación más sencilla y tangible, sobre todo con los interesados no técnicos (Dawood, 2010;Hartmann et al, 2008;Mourgues et al, 2007).…”
Section: Recursos Humanos E Interesadosunclassified
“…Referente a ello, se han recopilado las siguientes ideas: Dada la existencia de múltiples contratistas en las obras de construcción se hace necesario proporcionar un sistema integrado, el cual evita la costosa improvisación in situ al proporcionar posibilidad de anticipar mejor los conflictos en la fase de planificación, integrando las actividades de las diversas cuadrillas permitiendo con ello la alineación de las actividades y la prevención de costosos problemas de coordinación (Trebbe et al, 2015). De esta forma es posible reducir esfuerzos y errores (evitar re-trabajos) para mejorar el desempeño en los proyectos (Feng et al, 2010).…”
Section: Integraciónunclassified