IADC/SPE Asia Pacific Drilling Technology Conference 2016
DOI: 10.2118/180653-ms
|View full text |Cite
|
Sign up to set email alerts
|

4D FEA Simulation Assisted Pre-Job Planning Achieved Record-Breaking ROP and Delivered Longest Horizontal Section Well in West China

Abstract: In order to further enhance field development in North-West China land, wells were designed to drill 500m short 2-Dimensional curve section with 6~7deg/30m DLS and 2000m length horizontal leg using RSS+LWD BHA. Schlumberger as the contractor, was required to complete curve section in one run through soft shale, and to land in abrasive reservoir sand at over 3000m TVD. Great challenges were mainly on Bit selections, for good balance between steerability and aggressiveness of upper curve section Bit; while achie… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?