2015
DOI: 10.1016/j.desal.2015.07.022
|View full text |Cite
|
Sign up to set email alerts
|

80,000h operational experience and performance analysis of a brackish water reverse osmosis desalination plant. Assessment of membrane replacement cost

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
23
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
7
1
1

Relationship

2
7

Authors

Journals

citations
Cited by 52 publications
(25 citation statements)
references
References 29 publications
1
23
0
1
Order By: Relevance
“…Ruiz-Garcia et al [163] compared the difference of cost between when the specific energy consumption increases due to chronological effects such as fouling with and without replacing the RO membrane elements from 80,000 hours operation. The costs of electrical energy, chemical cleaning and membrane replacement were considered.…”
Section: Ro Element Performance and Other Cost Driversmentioning
confidence: 99%
“…Ruiz-Garcia et al [163] compared the difference of cost between when the specific energy consumption increases due to chronological effects such as fouling with and without replacing the RO membrane elements from 80,000 hours operation. The costs of electrical energy, chemical cleaning and membrane replacement were considered.…”
Section: Ro Element Performance and Other Cost Driversmentioning
confidence: 99%
“…The normalization of the RO operation data was carried out using the ASTM method [38]. The principal equations integrated with this technique were [39]:…”
Section: Normalization Methodmentioning
confidence: 99%
“…By way of comparison, pumping units were assumed to perform at 100%. The first case was the plant studied by the authors in previous works [29,30], whose permeate and feedwater inorganic composition is shown in Table 3. This water is characterized by high levels of bicarbonate.…”
Section: Plants Descriptionmentioning
confidence: 99%
“…Furthermore, it offers diverse optimum solutions in a direct manner, depending on the necessities and constraints established. In order to validate the program, experimental data compiled from 80,000 operating hours of a BWRO desalination plant was used to set the water and ionic permeability coefficients for the membrane element BW30-400 [29].…”
Section: Introductionmentioning
confidence: 99%