2022
DOI: 10.1002/fam.3070
|View full text |Cite
|
Sign up to set email alerts
|

A building information modelingfire dynamics simulation integrated framework for the simulation of passive fire protection in a mid‐scale cross‐laminated timber compartment: Numerical implementation and benchmarking

Abstract: Construction fires are a big threat to worker safety and property safety. Mass timber buildings under construction are largely unprotected as they are not yet equipped with active fire protection systems. With the addition of Types IVA, B, and C, the 2021 International Building Code adopted stricter requirements for mass timber buildings that are under construction. Cross‐laminated timber (CLT) is used as the primary structural element for high‐rise mass timber buildings. However, to date, limited number of re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 48 publications
0
3
0
Order By: Relevance
“…A large high-rise building construction project usually consists of several single projects. A single project can be decomposed into multiple unit projects, such as civil engineering water and electricity installation engineering [16]. Each unit project is further decomposed into several subprojects, such as civil engineering, which can be divided into basic engineering, main engineering, roofing engineering, and decoration engineering [17].…”
Section: A Overall Description Of High-rise Building Projectmentioning
confidence: 99%
“…A large high-rise building construction project usually consists of several single projects. A single project can be decomposed into multiple unit projects, such as civil engineering water and electricity installation engineering [16]. Each unit project is further decomposed into several subprojects, such as civil engineering, which can be divided into basic engineering, main engineering, roofing engineering, and decoration engineering [17].…”
Section: A Overall Description Of High-rise Building Projectmentioning
confidence: 99%
“…A framework is also presented for using building information modelling (BIM) with fire dynamics simulation (FDS) to simulate the fire behaviour of a CLT compartment that would be under construction 8 . An IFC model language is used for the data transfer between BIM viewing software and PyroSim.…”
Section: Figurementioning
confidence: 99%
“…A framework is also presented for using building information modelling (BIM) with fire dynamics simulation (FDS) to simulate the fire behaviour of a CLT compartment that would be under construction. 8 An IFC model language is used for the data transfer between BIM viewing software and PyroSim. This simulation is validated against a real experiment of a medium-sized CLT compartment with various exposed surfaces and the framework is used to decide which walls or ceiling should be protected while under construction.…”
mentioning
confidence: 99%