2020
DOI: 10.3390/su12104029
|View full text |Cite
|
Sign up to set email alerts
|

A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China

Abstract: Industrialized construction (IC) as a promising construction mode has been increasingly adopted in China due to its advantages of enhancing productivity and reducing the labor intensiveness in the construction industry. An objective and systematic evaluation of the IC mode is essential by clarifying the current weak areas in application and improving project performance. The meager existing studies have considered evaluating the IC maturity of prefabricated construction projects from the perspective of project… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 19 publications
(16 citation statements)
references
References 59 publications
0
16
0
Order By: Relevance
“…Accordingly, with the increase of powers, the level of maturity will also increase. In other words, maturity is a continuum, not an endpoint (Wang et al, 2020). Maturity models therefore include methods and tools to facilitate evaluation, identify deficiencies and provide ways for improvement.…”
Section: Maturity Model and Its Application In Project Managementmentioning
confidence: 99%
See 1 more Smart Citation
“…Accordingly, with the increase of powers, the level of maturity will also increase. In other words, maturity is a continuum, not an endpoint (Wang et al, 2020). Maturity models therefore include methods and tools to facilitate evaluation, identify deficiencies and provide ways for improvement.…”
Section: Maturity Model and Its Application In Project Managementmentioning
confidence: 99%
“…This century has been characterized by a rapid change in technology, business environment and customer needs, requiring most organizations to address these conditions in order to achieve their strategic goals. Organizations are now constantly looking for solutions to reduce project costs, improve quality and reduce time (Dziekoński, 2017; Wang et al. , 2020).…”
Section: Introductionmentioning
confidence: 99%
“…Respondents were requested to rate their level of satisfaction for 33 closed questions raised for 9 categories (5 enablers and 4 results in the EFQM excellence model) related to their organizational circumstances. Benchmarking this model, a number of scholars [37][38][39][40][41][42][43] have evaluated the perceptions of respondents based on Likert scale data. The questionnaire contained both positively and negatively worded items to identify random responses.…”
Section: Questionnaire Designmentioning
confidence: 99%
“…In addition, it can measure the consistency of results on importance through what is termed the consistency ratio (CR). Here, the AHP analysis proceeds as follows: (i) the decision-making problems are stratified into goals, criteria, and alternatives; (ii) a pairwise comparison of the decision-making elements is conducted at a given level of the hierarchy, with the pairwise comparison matrix calculated using Equation (1); (iii) the pairwise comparison matrix is converted into a normalized matrix calculated using Equation (2), and the average value of each row of the normalized matrix is calculated to derive a weighting factor; and (iv) to prove the effectiveness of the weighting factor, the CR calculated using Equation ( 4) is presented using the consistency index (CI) calculated using Equation (3) and the random index (RI) presented in Table 5 [53][54][55]. (1) n: n is the number of alternatives; (2) RI is the random index as defined by Saaty…”
Section: Explanation Of F-ahpmentioning
confidence: 99%