All Days 2016
DOI: 10.2118/afrc-2573101-ms
|View full text |Cite
|
Sign up to set email alerts
|

A Case Study of the Successful Deployment of Tractor Conveyed Perforation in Highly Inclined Well

Abstract: Well A is one of the only two wells on the XY reservoir structure providing the optimum drainage point on that reservoir. However, Well X had been shut in due to high sand production and had been flagged as ‘non-integral’ with regards to SPDC Well Integrity Management (WIM) policy due to its faulty Tubing Retrievable Surface Controlled Subsurface Safety Valve (TRSCSSSV). The well was thus scheduled for repairs. The objective of the workover operation as with most others done in SPDC was to resto… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 4 publications
0
0
0
Order By: Relevance