2021
DOI: 10.4018/ijepr.20211001.oa9
|View full text |Cite
|
Sign up to set email alerts
|

A Descriptive 3D City Information Model Built From Infrastructure BIM

Abstract: This study developed a descriptive 3D city information model (CIM) using only infrastructural building modeling tools to create maps, and analyzed the model according to needs identified in interviews with public-sector actors and a bibliometric analysis. The interviews assessed the challenges of implementing CIM in the Brazilian city of Curitiba, while the literature study determined that current academic production reflects the current reality, calling attention to relevant issues. The experimental software … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 30 publications
0
4
0
Order By: Relevance
“…Despite the potential of CIM, stakeholders are still reluctant to employ this tool for urban planning and management purposes. This hesitancy could be due to multiple reasons such as the lack of knowledge about the potential of CIM among leadership, lack of trust in results obtained via CIM, not including the necessity of using CIM in contracts, lack of investment in promoting the use of CIM, lack of training, lack of synergy between collaborators for using CIM and/or the absence of knowledge for utilising CIM (Pereira et al. , 2021).…”
Section: Challenges Of Cim Uptakementioning
confidence: 99%
“…Despite the potential of CIM, stakeholders are still reluctant to employ this tool for urban planning and management purposes. This hesitancy could be due to multiple reasons such as the lack of knowledge about the potential of CIM among leadership, lack of trust in results obtained via CIM, not including the necessity of using CIM in contracts, lack of investment in promoting the use of CIM, lack of training, lack of synergy between collaborators for using CIM and/or the absence of knowledge for utilising CIM (Pereira et al. , 2021).…”
Section: Challenges Of Cim Uptakementioning
confidence: 99%
“…Furthermore, the CIM is an emerging research field [121], which adds value to urban space construction and its management [122]. Hence, the latest progress of BIM research plays a key role in the application of CIM [123].…”
Section: The Advantages Of Building Information Modeling (Bim) Landsc...mentioning
confidence: 99%
“…In the Brazilian reality, acting as innovators in the democratic process falls to local governments (Flores & Rezende, 2018;Pereira et al, 2021), a consequence of the Brazilian federative design, which is excessively decentralized (Arretche, 2010). In the sense of inserting new ITs in cities to solve economic and social problems, the work of the public authorities has reoriented the development of communication infrastructures.…”
Section: On Urban Management and Planningmentioning
confidence: 99%
“…Digital city models gained centrality in discussions within urban studies and, among others, for processing and analytical purposes (Lemos, 2011). These artifacts can add value to the process of planning and managing the urban space (Pereira, Buzzo, Zimermann, Huckembeck Neto, & Malgarezi, 2021). Other than that, these tools can enable new integrated decision support methodologies (Ergazakis, Ergazakis, Askounis, & Charalabidis, 2011), which represents new ways to face how we plan and manage the urban space.…”
Section: Introductionmentioning
confidence: 99%