A Dynamic Just‐in‐Time Component Delivery Framework for Off‐Site Construction

Abstract: Off-site construction entails various advantages compared with the traditional construction method; however, the fragmentation of the prefabrication and assembly results in a complex supply chain. Both general contractors and factories often encounter production deviation, making the original component delivery plan nonoptimal. Traditionally, both parties tend to rely on internal resources or third-party resources to manage schedule changes, paying little attention to the optimisation of the component delivery… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 15 publications
(13 citation statements)
references
References 76 publications
0
7
0
Order By: Relevance
“…Therefore, we mainly focus on content validity and construction validity, in which construction validity includes combinatorial validity and discriminant validity. A valid term refers to the applicability of a question to a related concept or behavioral pattern to determine whether the test is an example of a behavioral pattern to measure [ 17 , 18 ]. The content validity of this paper mainly emphasizes three aspects.…”
Section: Methodsmentioning
confidence: 99%
“…Therefore, we mainly focus on content validity and construction validity, in which construction validity includes combinatorial validity and discriminant validity. A valid term refers to the applicability of a question to a related concept or behavioral pattern to determine whether the test is an example of a behavioral pattern to measure [ 17 , 18 ]. The content validity of this paper mainly emphasizes three aspects.…”
Section: Methodsmentioning
confidence: 99%
“…Another commonly used lean construction method is the Just in Time technique. The arrival of modules as per and when needed to the site enables eradicating inventory waste [7]. Design for Manufacture and Assembly (DfMA) has seen overwhelming application in the prefabrication sector whereby cost is minimized and overall valueadding activities are witnessed [8].…”
Section: Lean Construction Methodsmentioning
confidence: 99%
“…Lee et al (2019) presented the classification of PC projects as manufacturing driven, on-site driven or a combination to improve scheduling strategies based on a scheduledriven approach. Si et al (2021) proposed a dynamic compensation mechanism to realize timely component delivery, through which the factory could share the possible changes of the delivery date of each component with its customers. Aiming to achieve lean PCSC, Chen et al…”
Section: Stratified Reviewmentioning
confidence: 99%