A Dynamic Model of Procurement Risk Element Transmission in Construction Projects

Abstract: The cost of materials is the largest proportion of a construction project’s total budget. If the materials cannot be delivered to the construction site on time, completely and with acceptable quality, the project’s duration and cost will be greatly affected. Based on the generalized project risk element transmission theory and system dynamics, a system dynamics model was developed to capture dynamics of procurement risk elements transmission during construction projects and how various procurement risk element… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 19 publications
0
4
0
Order By: Relevance
“…Secondly, the quadratic weighting method is used to deal with the overall situation of the evaluated object from t1 to tn, to obtain the final comprehensive evaluation value. This paper utilizes the approaches employed by Geil et al and Li et al [ 44 , 45 ] to construct the following model: …”
Section: Research Methodology and Datamentioning
confidence: 99%
“…Secondly, the quadratic weighting method is used to deal with the overall situation of the evaluated object from t1 to tn, to obtain the final comprehensive evaluation value. This paper utilizes the approaches employed by Geil et al and Li et al [ 44 , 45 ] to construct the following model: …”
Section: Research Methodology and Datamentioning
confidence: 99%
“…Li (Li & Liang 2009) was also aware of the dynamic characteristics of the risk transfer process. Therefore, after putting forward the risk element transfer theory, combined with system dynamics, he successively put forward several risk transfer models of project management (Li et al 2012(Li et al , 2015a(Li et al , 2015b.…”
Section: Quantitative Modeling Tools In System Dynamicsmentioning
confidence: 99%
“…Construction. According to a series of studies of the carbon emission performance evaluation, the analysis of the actual development situation of China's new energy enterprises, the different division of labor workers of new energy enterprises, based on the previous scholars, experts, combined with the theory of stakeholders and the principle of indicator selection, the evaluation indicator system of carbon emission performance of new energy enterprises is determined [25][26][27][28][29][30][31][32].…”
Section: Evaluation Indicator Systemmentioning
confidence: 99%
“…e measurement instruments are developed and adapted by previous research results and achievements [25][26][27][28][29][30][31][32], finally, five indicators of enterprise self-awareness (environmental protection), enterprise emission reduction awareness, low-carbon technology R&D investment, environmental protection investment increase rate, enterprise system management and environmental protection investment effect are selected as the evaluation indicators in the overall evaluation indicator system of this study. e final carbon emission performance evaluation indicator system can be seen in Table 1.…”
Section: Evaluation Indicator Systemmentioning
confidence: 99%